Parameters | |
---|---|
Factory Lead Time | 1 Week |
Part Status | Active |
Moisture Sensitivity Level (MSL) | 1 (Unlimited) |
Number of Positions | 25 |
Approval Agency | cULus, UL |
Specifications | Interface |
Process Side Connection | D-Sub Connector |
Control Side Connection | Controller Specific Connector |
RoHS Status | RoHS Compliant |