Parameters | |
---|---|
Factory Lead Time | 1 Week |
Mounting Type | Rack Mount |
Part Status | Active |
Moisture Sensitivity Level (MSL) | Not Applicable |
Type | PDU (Power Distribution Unit) |
Approval Agency | UL |
Voltage - Input | 120V |
Current - Max | 20A |
Cord Length | 10' 3.05m |
Overload Protection | None |
AC Outlets | 8 |
Connector - AC Output | NEMA 5-20R |
Connector - AC Input | NEMA 5-20P |