Parameters |
Factory Lead Time |
1 Week |
Packaging |
Tape & Reel (TR) |
Part Status |
Active |
Moisture Sensitivity Level (MSL) |
3 (168 Hours) |
MC33FS8510A3ESR2 Overview
It is acceptable to ship in the direction of Tape & Reel (TR) .
MC33FS8510A3ESR2 Features
MC33FS8510A3ESR2 Applications
There are a lot of NXP USA Inc. MC33FS8510A3ESR2Power Management applications.
- Computing
- Docking station
- Real-time Signal Monitoring
- Hardware Monitoring for PCs
- Projection Mapping
- Portable Systems
- Portable Navigation Devices
- Industrial PC
- Switches
- Surround view system ECU